Day 36 (Sep 8, 2012)  

Worked on driveshaft tunnel and floor 

 Day 37 (Sep 15, 2012) 

Worked on right rocker and floor. Rebuilt the front right cab corner. 

 Day 38 (Sep 16, 2012) 

Left side floor and rocker 

 Day 39 (Sep 17, 2012)  

 Left front section of rocker.

 Day 40 (Sep 21, 2012) 

 Left side floor.

Make a Free Website with Yola.