Day 41 (Sep 22, 2012)  

 Left side floor. Modified the trans crossmember.

 Day 42 (Sep 23, 2012)  

 Completed 3 floor pieces over the trans CM and left side of trans tunnel. Replaced upper left toe board. Calvin modified the trans crossmember to work with the T350.

 Day 42 (Sep 24, 2012)   

Cut out and replaced right upper toe board. 

Make a Free Website with Yola.